City and Guilds Level 2 2365-02 Intensive
ake the City and Guilds Level 2 2365-02 in 3 weeks. Monday – Friday 9.00 am to 4.30 pm. Payment £1,000 (inc. VAT) initial payment on booking £820 (inc. VAT) by week 2 £820 (inc. VAT) by week 3 Places …
Overview
ake the City and Guilds Level 2 2365-02 in 3 weeks. Monday – Friday 9.00 am to 4.30 pm.
Payment
£1,000 (inc. VAT) initial payment on booking
£820 (inc. VAT) by week 2
£820 (inc. VAT) by week 3
Places Limited.
The Level 2 City & Guilds 2365 diploma in Electrical Installations is designed to help those that want to get started within the world of electrical installation but don’t currently have a job within the trade and can’t get on the apprenticeship route.
The course is made up of five units consisting of four theory units and one practical unit. Information for online end of unit tests below:
Unit 201: Health and Safety: Duration is 40 minutes with a total of 25 questions. Pass mark 60%
Unit 202: Principles of Electrical Science: scientific calculator, pen/pencil to make notes for formulas/calculations – Duration is 90 minutes with a total of 40 questions. Pass mark 50%
Unit 203: Electrical Installation Systems: Duration is 75 minutes with a total of 40 questions. Pass mark 60% – open book exam using labelled copy of IET On-Site Guide – BS 7671: 2018+A2:2022, scientific calculator, pen for calculations and notes. We will highlight important sections prior to the unit test. This is the final theory test.
Unit 210: Communication within the Building Industry: Duration is 40 minutes with a total of 20 questions – Pass mark 60%
All online tests are taken here at PTT, and all end-of-unit questions are multiple choice answers.
Independent study is also required as this is a compact short-term course, so please make use of the revision materials provided. Throughout the course you will encounter – written work, Maths and Science for working out formulas, equations and calculations, Health and Safety Practical Assessments, Bay Build Practical Assignment and four online theory-based unit tests with multiple-choice answers.
Unit 204: Bay Build Practical assessment in Workshop to include – wiring diagram – material list – tool list – written Wiring calculations and Containment calculations showing workings out to determine cable sizes, circuit protective device ratings and Cable capacities of conduit and trunking.
You will be required to install three circuits consisting of: 2-way switch lighting contained within PVC conduit – Ring final circuit to include 2-gang sockets x3 and a fused spur contained within steel conduit and trunking – 16A blue commando socket in SWA (steel wire armoured) cable mounted on steel tray – Schedule of Test Results showing Continuity, Insulation Resistance and Polarity.